Skip to main content
Whatsapp

How to Mark For Setback Concession in Road/Nala Widening

Tutorial Video


Steps

  1. Select between Setback Concession/Transfer of Setbacks case

    1. Click on Guided Marking. If two Site Plans are present in the drawing, then the Setback Concession/Transfer of Setbacks window opens.
    2. From the dropdown, select "CONCESSION_FOR_ROAD_OR_NALA_WIDENING".
  2. Mark After Road/Nala Widening Concession Site Plan

    1. Search for the "Site Plan" that represents the Site Plan After Concession. Site Plan Type form appears on the right side of the screen.
    2. Select "AFTER_CONCESSION" from the dropdown.
    3. Click "Save and Next Unmarked".
    4. Provide the data for the Proposed Work in the AFTER_CONCESSION site plan:
      1. Proposed Work Type
      2. Proposed Work Number
    5. Click "Save and Next Unmarked".
  3. Mark Before Road/Nala Widening Concession Site Plan

    1. Search for the "Site Plan" that represents the Site Plan Before Concession. Site Plan Type form appears on the right side of the screen.
    2. Mark Site Plan For as "BEFORE_CONCESSION" from the dropdown.
    3. Click "Save and Next Unmarked".
    4. Provide the data for the Proposed Work in the BEFORE_CONCESSION site plan:
      1. Proposed Work Type
      2. Proposed Work Number
    5. Click "Save and Next Unmarked".
  4. Map After Proposed Work to Corresponding Before Proposed Work

    1. Select "Before and After Proposed Work Mapping" section.
    2. You can see After Proposed Work is highlighted in the drawing.
    3. Tick the checkbox against the corresponding Proposed Work in the "Before Proposed Works" section to map with the selected After proposed work.
    4. Click "Save and Next Unmarked".

Checkpoints

  1. Ensure that there are two Site Plans -
    1. One for Before Concession.
    2. One for After Concession.

Drawing Conventions

  1. Ensure that 2 site plans are present outside the __BN_BuildingPlan Layer.

Layer-Wise Details

Build Now